Skip to content

Example: 12,400 m² office centre, simulated data

Example: 12,400 m² office centre, simulated data

Energy management for commercial real estate

See where your building wastes electricity

Vatt connects to the meters and controllers your building already has and finds waste: night-time base load, ventilation running in an empty building, demand peaks.

  • Modbus, M-Bus, BACnet/IP, OPC UA
  • EU or US cloud, or your own server
  • Read-only by default

One day in one building

Keep scrolling and the chart clock moves forward

Example: 12,400 m² office centre, simulated data

Chart time
03:10
Demand now
158 kW
Since midnight
517 kWh
Cost
$72
Waste today
$17
  1. 00:00–06:10

    Ventilation ran overnight

    Supply air unit AHU-1 missed its scheduled stop and ran all night in the empty building: +38 kW on top of the base load.

    What it costs
    ≈233 kWh, about $33 per night
    What to do
    Check the AHU-1 schedule in its controller and turn on schedule compliance monitoring.
  2. 08:00–08:35

    Morning start-up peak

    The chiller and two supply air units started at the same moment: a 356 kW peak, 11% above the usual daily maximum.

    What it costs
    A higher capacity charge, if your contract has one
    What to do
    Stagger equipment start-up by 10–15 minutes.
  3. 11:00–15:00

    Heating and cooling at once

    In the 4th-floor meeting rooms fan coils were cooling air that radiators were heating. The chiller worked for nothing: +22 kW.

    What it costs
    ≈84 kWh, about $12 over 4 hours
    What to do
    Separate the heating and cooling setpoints with a 2 °C gap.
Building demand over the day, kWDemand since 00:00: peak 356 kW, 5,504 kWh in total. The three anomalies are described in the notes.
TodayNormal weekdayWaste

What Vatt looks for

Waste shows in the shape of the curve

Vatt compares actual demand with the building schedule and its normal profile. When they diverge, you get an anomaly with an estimate in kilowatt-hours and dollars.

  1. At night the building draws more than half of its daytime peak with nobody inside. Usually it is ventilation, car park lighting and equipment on standby.

    Signal Night minimum as a share of the daytime peak

How it works

From meter to decision

Five steps building data goes through before it becomes a report or a new schedule.

  1. Connect

    An on-site gateway polls meters and controllers over Modbus, M-Bus, BACnet or OPC UA. New meters are not required.

    Meters at incomers and panels

  2. Normalise

    Readings from different devices are aligned to the same 5-minute intervals and mapped to building, floor and system. Communication gaps are flagged, not filled with guesses.

    Floors and systems

  3. Detect waste

    Demand is compared with the schedule, the weather and the normal profile. Every anomaly comes with an estimate in kilowatt-hours and dollars.

    Anomaly: ventilation at night

  4. Automate

    Climate and lighting schedules are edited in the platform. Writing to a controller is enabled per device; access is read-only by default.

    Rooftop HVAC schedule

  5. Report

    Once a month the owner and the facility manager receive a report: consumption by building, waste, measures taken and their effect.

    Monthly report

Pricing

Pay per metering point, not per user

Every module is included in the subscription. The more points you connect, the less each additional one costs.

  • 1–50

    $15

    per point per month

  • 51–200

    $12

    per point per month

  • 201+

    $10

    per point per month

Implementation from $5,000 per building, one-off

Full terms and answers to common questions

Night, the same building

AHU-1 is running until morning again

The unit's schedule is edited in the platform. Writing to a controller is enabled per device; by default Vatt only reads data.

Building demand from 00:00 to 07:00Demand now 157 kW

TodayNormal weekdayWaste

With the mouse, a finger or the Space key

See Vatt on a building like yours

In 45 minutes we show the platform on a similar building and work out which meters and controllers can be connected right away.